Metro plan is far from seamless

Sir, – Further to "Metrolink terminus at Charlemont provides seamless Luas link, NTA says" (News, May 4th), drawings issued for the Charlemont Metro Station show two lines about 200 metres apart, one below ground and one on a bridge.

They are connected by three flights of escalators, a walk in the open and three flights of steps (apparently two-way).

The word “seamless” does not leap out as the way to describe this. – Yours, etc,

EUGENE BARRETT,

READ SOME MORE

Metro South West

Steering Committee,

Knocklyon,

Dublin 16.